Progress continues on wiring

I’ve neglected to post over the past week. Been a busy week at work. I have made some good progress though.

I vinyl-wrapped the fuse block panel and screwed the fuse block into it. I made a bus bar from a strip of copper to tie together the upper and lower buses of the fuse block.

 

I drilled some system holes through the left seat ribs, installed snap bushings, and ran the pitot and AOA lines from the wing root to the panel.

 

Drilled a couple of system holes in the lower sub-panel. Routed the the wires for the battery backup. Terminated the grounds for the the IBBS and the IBBS master switch.

 

Made up the connectors for the GTX 45R transponder and the GTN 625 GPS. I also started on the GTR 200B COM radio but didn’t get a picture.

 

Today’s Time (hours): 6.0
Finish Kit (hours): 112.0
Total Time (hours): 842.0

 

Began wiring the panel

I’ve spent quite a bit of time researching and documenting a plan to make the wiring easy. I complied a list of wiring nodes in a spreadsheet that I can use as a checklist to work my way through the project. You can see my work here… Wiring Plan

Didn’t actually wire anything today but rather did a lot of the prep work. I fabricated a center panel that will hold the fuse block in the center pedestal. I purchased the power panel option from Van’s which included the sheet metal for the center console. I purchased the 32 position Busman fuse block from Waytek.

 

Prepped everything up and painted it to match the interior.

img_4480

 

Removed all of the avionics and the panels. I probably could have left the stuff mounted to the sub panel and left the panels in place. But when I had mounted everything with black oxide steel screws and subsequently learned that they would rust over time. So I purchased black oxide stainless replacements. This was the most opportune time to replace them all.

 

I installed a ground block being careful to remove all the paint and scuff up the sub-panel to ensure a good electrical connection. I re-mounted the backup battery, the GAD 27, GAD 29, and GEA 24 to the sub panel.

 

I drilled a couple of new wire holes through the bottom of the stand-offs and installed snap bushings. The original holes interfered with the GTX and the switches in the bottom of the middle panel.

img_4481

 

Today’s Time (hours): 8.0
Finish Kit (hours): 106.0
Total Time (hours): 836.0

 

More wiring

Run the left side of the main harness. Terminated the antenna connections; TNC for the GPS and BNC for the com and transponder. Only did the antenna side. I’ll get the panel end when I wire the panel.

 

Getting the snap bushings into the wire guides was a huge pain in the ass. super tight. especially with the additional can bus wire. I ended up pulling that wire out and getting the snap bushings in. Once they were in I was able to push the can bus cable through.

img_4109

 

On a brighter note, my seats came in today. Abby at Flightline Interiors did an amazing job. Very happy.

img_4107

 

Today’s Time (hours): 2.0
Options and Miscellanea Time (hours): 46.0
Total Time (hours): 735.0

 

 

Work continues on baggage area

Fabricated the seat back hinges and match drilled to the floor skins.

img_3776

 

Deburred, Scuffed, and primed all of the parts.

img_3777

 

Dimpled the floor skins and riveted the nut plates in place.

 

Installed snap bushing and routed the rudder cables, static line, and ELT wire.

img_3780

 

 

Today’s Time (hours): 5.0
Fuselage Time (hours): 149.0
Total Time (hours): 603.5

Rinse, repeat, right spar complete

Match drilled the J channel to the spar.

img_2217

Machine countersunk the nutplate attach holes.

img_2220

 

Riveted in the nutplates

img_2221

 

Countersunk the screw holes.

img_2222

 

Machine countersunk all the skin attach holes.

img_2229

 

Riveted in the nutplates at the tip end of the spar.

img_2225

 

Riveted the doubler to the spar and installed the tank attach nutplates.

img_2226

 

Final drilled, deburred, scuffed and primed the aileron bell crank brackets

img_2224

Installed and torqued the aileron bell crank brackets.

img_2230

Right spar done!

img_2231

 

Today’s Time (hours): 4.5
Wing Time (hours): 21.5
Total Time (hours): 232.5

 

Countersunk ALL the holes

Countersunk the tank attach screw holes.

img_2207

 

Installed the inspection plate nut plates and countersunk the screw holes.

img_2208

 

Countersunk all the skin attach holes.

img_2210

 

Installed the snap bushings and the the four nutplates at the tip end of the spar.

img_2209

Today’s Time (hours): 2.0
Wing Time (hours): 16.0
Total Time (hours): 227.0