Work continues on baggage area

Fabricated the seat back hinges and match drilled to the floor skins.

img_3776

 

Deburred, Scuffed, and primed all of the parts.

img_3777

 

Dimpled the floor skins and riveted the nut plates in place.

 

Installed snap bushing and routed the rudder cables, static line, and ELT wire.

img_3780

 

 

Today’s Time (hours): 5.0
Fuselage Time (hours): 149.0
Total Time (hours): 603.5