Completed baggage area (Section 32)

Machine countersunk the baggage floor splice plate and riveted in place.

img_3785

 

dimpled the flap motor channel and installed the nut plates. Then riveted it in place. Riveted the flap motor brackets to it.

 

Riveted the baggage side walls in place.

img_3789

 

Bam! Baggage area. Done.

img_3790

 

Today’s Time (hours): 3.0
Fuselage Time (hours): 155.0
Total Time (hours): 609.5

Work continues on baggage area

Fabricated the seat back hinges and match drilled to the floor skins.

img_3776

 

Deburred, Scuffed, and primed all of the parts.

img_3777

 

Dimpled the floor skins and riveted the nut plates in place.

 

Installed snap bushing and routed the rudder cables, static line, and ELT wire.

img_3780

 

 

Today’s Time (hours): 5.0
Fuselage Time (hours): 149.0