Fabricated the seat back hinges and match drilled to the floor skins.
Deburred, Scuffed, and primed all of the parts.
Dimpled the floor skins and riveted the nut plates in place.
Installed snap bushing and routed the rudder cables, static line, and ELT wire.
Today’s Time (hours): | 5.0 |
Fuselage Time (hours): | 149.0 |
Total Time (hours): | 603.5 |
Looking good!
LikeLike