Installed the links that attach the rudder cables to the rudder pedals. Riveted the rudder cable fairleads in place. Not pictured, I also bolted in the four adel clamps that hold the plastic rudder cable routing tubes in place. This was a huge pain in the ass. Very little room to get fingers in to get the nuts started. Plus the angle of the tunnel cants the bolts in toward the adjacent structure making it hard to get a socket or wrench on the nuts. But futzed with it long enough and got it done.
Today’s Time (hours): | 2.0 |
Fuselage Time (hours): | 170.0 |
Total Time (hours): | 624.5 |