Finished Seat Backs (Section 39)

I bolted together the lower corners of the seat backs. I drilled holes in the top angles using the template provided by FlightLine interiors. I blind riveted the snaps to the angles using those holes. I attached the seat back cushions to the seat backs with the snaps and the velcro provided.

 

Love the way the seats came out.

 

I also repainted the aft canopy frame. I wasn’t happy with my first attempt. It was splotchy and had spots of pretty bad orange peel. I wet sanded it and reshot it. It still looked awful. So I ended up stripping it down using acetone and repainting the bare metal. It came out quite a bit better. I’m wondering if the problem is the P60G2 primer. I’m going to shoot the remaining interior parts over bare metal.

 

 

Today’s Time (hours): 3.0
Finish Kit (hours): 60.0
Total Time (hours): 790.0

 

 

Painted canopy and seat backs

Masked off the top of the skin and the outboard sides of the side rails. Painted two coats on the the aft canopy frame and the inboard sides of the side rails. Tomorrow night I’ll flip it over and paint the bottom after everything dries.

 

Scuffed the seat backs and braces. Wiped everything down with solvent and then with a tack rag. Painted tow coats on the forward side. I’ll get the aft side tomorrow night after everything is dry.

 

Fabricated the hinge pins for the seat backs and braces.

img_4294

 

Are we having fun yet?

img_4293

 

Today’s Time (hours): 5.0
Finish Kit (hours): 56.0
Total Time (hours): 786.0

 

 

Started the Seat Backs (Section 39)

Screen Shot 2020-02-09 at 5.14.16 PM

 

Picked and inspected all the parts. Peeled off all the blue vinyl and labels.

 

Cut the corners off the seat back angles.

img_4275

 

Separated the parts that needed parting. Deburred everything.

 

Fabricated the seat back and seat brace hinges. Match drilled the hinges to their corresponding parts. Machine countersunk the brace stiffeners and braces. Riveted the brace assemblies together.

 

Riveted together the seat backs.

img_4288

 

I’ll scuff and paint these along with the canopy.

 

Today’s Time (hours): 4.0
Finish Kit (hours): 51.0
Total Time (hours): 781.0