Completed baggage area (Section 32)

Machine countersunk the baggage floor splice plate and riveted in place.

img_3785

 

dimpled the flap motor channel and installed the nut plates. Then riveted it in place. Riveted the flap motor brackets to it.

 

Riveted the baggage side walls in place.

img_3789

 

Bam! Baggage area. Done.

img_3790

 

Today’s Time (hours): 3.0
Fuselage Time (hours): 155.0
Total Time (hours): 609.5