Began Work on Upper Forward Fuselage (Section 35)

Screen Shot 2019-12-07 at 11.38.33 PM

 

Picked, inspected, and peeled all the parts.

 

I separated all the parts that required parting and began fabrication. I made the canopy release pins by shortening and chamfering the ends of a couple of eye bolts. I made the canopy release push tubes from some aluminum tubing.

 

Today’s Time (hours): 3.0
Fuselage Time (hours): 176.0
Total Time (hours): 630.5

Began work on the flap actuation system (Section 34)

Screen Shot 2019-12-06 at 9.36.10 PM

 

Picked and inspected all four parts.

img_3819

 

Used the alignment template thing-a-mabob to locate and match drill the holes from the crank to the torque tubes.

img_3820

 

I primed the inside of the tubes with SEM. I’ll let them dry tonight and install everything tomorrow.

 

 

Today’s Time (hours): 1.0
Fuselage Time (hours): 171.0
Total Time (hours): 625.5

Work continues on baggage area

Fabricated the seat back hinges and match drilled to the floor skins.

img_3776

 

Deburred, Scuffed, and primed all of the parts.

img_3777

 

Dimpled the floor skins and riveted the nut plates in place.

 

Installed snap bushing and routed the rudder cables, static line, and ELT wire.

img_3780

 

 

Today’s Time (hours): 5.0
Fuselage Time (hours): 149.0
Total Time (hours): 603.5

Completed most of the fabrication steps

In case you haven’t noticed, I’ve settled into a strategy for most sections of the build… First I pick, inspect, and peel all the parts for the section. The I take a first pass through the instructions and perform all of the steps that require cutting, grinding, bending, etc. Then I deburr, scuff, and dimple all the parts. Then I prime everything. Finally I assemble and rivet everything. I’ve found this approach is much quicker then going step by step in the order of the instructions. I can set up the shop and tools for each operation and reorganize after each operation. I kind of get into a groove with each of the operations and avoid frequent tool changes. I also only need to set up for paint, which is a major operation, once per section.

Today I was focused on fabrication steps… I started with the upper longerons. I cut and trimmed according to the plans. The fabricated a couple of clamping blocks that allowed me to secure each longeron in the bench vise and clamp a lever to the end in order to bend a 10 degree twist into them. Finally I clamped and clecoed the upper engine mount brackets to the forward end of the longerons and match drilled them.

 

Drilled and cut the lower longerons and match drilled them to the lower engine mount brackets and longeron doublers.

 

Fabricated the hinges that will attach the cowling to the firewall.

img_3549

 

Separated a whole bunch of parts. Unfortunately my bandsaw blade gave up the ghost early on and I didn’t have a spare. So I used the snips for the thinner aluminum and the Dremel with a cutoff wheel for the thicker parts. A little bit slower but not too bad.

img_3550

 

I managed to lose a part somehow. I turned the shop upside down and couldn’t find the F-01422 Fuselage Side Ribs. I checked it off on the inventory. No idea what happened to it. Ordered a new one from Van’s.

 

Today’s Time (hours): 5.0
Fuselage Time (hours): 80.0
Total Time (hours): 534.5

 

Started assembling the lower skins and muffler shroud.

Dimpled the bottom skins and riveted the com antenna doublers and skin stiffeners to them. I’m only installing a single com radio so I only drilled out the right side skin for the antenna. The left side I installed some rivets to fill the starter holes. I did install the left side antenna doubler in case i want to add another radio later. I can just drill out the rivets and upsize the holes to install another antenna.

 

Dimpled the muffler shroud parts. Riveted the doublers and muffler hanger brackets to the shroud sides. Riveted the nut plates to the fuel pump brackets and then riveted the brackets to the shroud ramp.

 

Today’s Time (hours): 2.0
Fuselage Time (hours): 65.0
Total Time (hours): 519.5

 

Continued assembling the firewall

Riveted the angles and lower gusset to the right firewall side. Used tank sealant to Seal the top of the firewall to the sides and clecoed in place along with the top firewall angle and riveted them together. Clecoed the tunnel sides to the firewall assembly. Sealed the firewall center to the sides and top and clecoed in place. Clecoed the upper top angle and gussets in place. Final drilled the nose gear brackets.

 

Today’s Time (hours): 2.0
Fuselage Time (hours): 61.5
Total Time (hours): 516.0

 

Dimpled the bottom skin and riveted stuff to it.

Dimpled the bottom skin. Today’s word of the day: unwieldy.

 

 

Riveted the doublers and stiffeners to the bottom skin.

 

 

Dimpled the gear brace bracket and machine countersunk the gear brace bars. Riveted the gear brace assembly together and then riveted it to the skin.

 

 

Clamped the lower fuselage substructure to the bench and clecoed the skin to it. Ready for riveting.

 

 

Today’s Time (hours): 6.0
Fuselage Time (hours): 37.0
Total Time (hours): 491.5

 

Assembly continues

Fluted the outboard seat and baggage ribs to mach the curve of the bottom skin. Riveted nut plates to the seat ribs.

 

Bolted and riveted the seat ribs to the bulkhead assembly.

 

img_3328

 

Riveted the seatbelt lugs and routing angles to the baggage ribs.

 

Riveted the aft bulkhead to the seat rib assembly. Drilled and riveted the doubler to the bulkhead. Fabricated and riveted together the idler bearing assembly and riveted to the bulkhead.

 

Clecoed the bottom skins together and match drilled some holes. Cut the landing gear leg openings in the forward skins. Machine countersunk the doublers and dimpled the skin stiffeners. Drilled the 9/16″ hole in the skin with a step drill. This hole will be used to mount the transponder antenna.

 

 

Today’s Time (hours): 5.0
Fuselage Time (hours): 31.0
Total Time (hours): 485.5

 

Wings are complete!!!

Completed the repair to the attach hole that I blew out last week. The fiberglass and micro cured up nicely. I sanded it flush, re-drilled and countersunk the holes, and riveted the nut plate on.

 

The molex connectors that I ordered from McMaster arrived so I inserted the pins and bundled the wires with wire ties.

img_3216

 

This completes construction of the wings! Very excited to move on to the fuselage.

 

Today’s Time (hours): 0.5
Wing Time (hours): 298.5
Total Time (hours): 450.5

 

Completed left wingtip–Almost

All the things I did to the right wing yesterday, I did to the left wing today.

 

 

Thought I was finally at th end of the wings… but ran into another snag. When I was countersinking the screw holes in the tip, I hit a thin spot in the fiberglass and the countersink caught and made a giant hole. So I made a fiberglass patch. I’ll fill in the other side with some micro once the patch sets up. Then I can install the final nut plate and be done with the wings!

 

 

Traveling this week. So I will begin work on the fuselage next weekend.

Today’s Time (hours): 5.0
Wing Time (hours): 298.0
Total Time (hours): 450.0