Continued assembling the firewall

Riveted the angles and lower gusset to the right firewall side. Used tank sealant to Seal the top of the firewall to the sides and clecoed in place along with the top firewall angle and riveted them together. Clecoed the tunnel sides to the firewall assembly. Sealed the firewall center to the sides and top and clecoed in place. Clecoed the upper top angle and gussets in place. Final drilled the nose gear brackets.

 

Today’s Time (hours): 2.0
Fuselage Time (hours): 61.5
Total Time (hours): 516.0

 