Dimpled the bottom skin. Today’s word of the day: unwieldy.
Riveted the doublers and stiffeners to the bottom skin.
Dimpled the gear brace bracket and machine countersunk the gear brace bars. Riveted the gear brace assembly together and then riveted it to the skin.
Clamped the lower fuselage substructure to the bench and clecoed the skin to it. Ready for riveting.
Today’s Time (hours): | 6.0 |
Fuselage Time (hours): | 37.0 |
Total Time (hours): | 491.5 |