Began work on the flap actuation system (Section 34)

Screen Shot 2019-12-06 at 9.36.10 PM

 

Picked and inspected all four parts.

img_3819

 

Used the alignment template thing-a-mabob to locate and match drill the holes from the crank to the torque tubes.

img_3820

 

I primed the inside of the tubes with SEM. I’ll let them dry tonight and install everything tomorrow.

 

 

Today’s Time (hours): 1.0
Fuselage Time (hours): 171.0
Total Time (hours): 625.5

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s