Picked and inspected all four parts.
Used the alignment template thing-a-mabob to locate and match drill the holes from the crank to the torque tubes.
I primed the inside of the tubes with SEM. I’ll let them dry tonight and install everything tomorrow.
Today’s Time (hours): | 1.0 |
Fuselage Time (hours): | 171.0 |
Total Time (hours): | 625.5 |