Finished riveting the skin and hinges. Just need to seal everything up with some tank sealant and that will complete the section.

| Today’s Time (hours): | 2.0 |
| Fuselage Time (hours): | 200.0 |
| Total Time (hours): | 654.5 |
Finished riveting the skin and hinges. Just need to seal everything up with some tank sealant and that will complete the section.

| Today’s Time (hours): | 2.0 |
| Fuselage Time (hours): | 200.0 |
| Total Time (hours): | 654.5 |
Sealed and riveted the top skin center section in place leaving the sides free to provide access to install the canopy hinges and release mechanism.
Installed the canopy hinges and canopy cradles and connected up the gas springs.

Installed the canopy release mechanism.

| Today’s Time (hours): | 3.0 |
| Fuselage Time (hours): | 198.0 |
| Total Time (hours): | 652.5 |
Match drilled the cowl attach hinges.

Took everything apart and dimpled the skin, the firewall flanges, and shims. Machine countersunk the hinges and longerons.
I got the nut plates I ordered. So I also finished riveting the instrument panel in place.
| Today’s Time (hours): | 2.0 |
| Fuselage Time (hours): | 195.0 |
| Total Time (hours): | 649.5 |
Laid a bead of tank sealant to fill the gap between the side skin, longeron, and canopy deck. Then I clecoed and riveted the canopy decks in place.
Riveted the wire supports to the bottoms of the panel standoffs.

Clecoed the panel in place. I couldn’t rivet it because I ran out of K1000-06 nut plates. Ordered from Spruce.
| Today’s Time (hours): | 2.0 |
| Fuselage Time (hours): | 191.0 |
| Total Time (hours): | 645.5 |
Clecoed then riveted the sub-panel assembly to the fuselage.
Riveted nut plates into the wiring channel. Painted the assembly and later installed it into the fuselage after the paint dried.
Match drilled the forward and aft canopy decks to the left and right longerons. Then dimpled the holes in the canopy decks and machine countersunk the holes in the longerons. Painted the canopy decks as well as the panel brackets and wiring supports.
Machine countersunk all the holes in the instrument panel frame. Riveted the instrument panel angles, nut plates, and flange doubler to the frame. Painted the assembly.
Ground one of the corners off of the fresh air vents to match up to the flange that connects it to the fuselage and naca duct.

| Today’s Time (hours): | 5.0 |
| Fuselage Time (hours): | 189.0 |
| Total Time (hours): | 643.5 |
Got all the forward fuselage parts primed.
Machine countersunk all the doublers. Riveted the stiffeners and doublers to the forward fuselage ribs.
Machine countersunk the doublers and riveted them to the canopy hinge ribs.

Riveted nut plates to the pivot block channel and riveted that assembly to the forward fuselage channel.

Riveted the map box doubler to the sub panel. Riveted the sub panel angle, canopy hinge ribs, forward fuselage channel to the sub panel. Riveted the forward fuselage rib assemblies to the sub panel. Riveted the instrument panel standoffs to the sub panel. Riveted the seal angles to the sub panel. Painted the aft side of the sub panel to match the interior.
| Today’s Time (hours): | 6.0 |
| Fuselage Time (hours): | 184.0 |
| Total Time (hours): | 638.5 |
Riveted the brake pedals together. Decided to machine countersink the front of the pedals and use flush rivets. I plan to put grip tape over the front of the pedals. So the universal rivets wouldn’t have worked for me.

I’ll hit the pedals with a final coat of paint to cover up the rivets tomorrow morning. Once that dries, I’ll apply the grip tape and cut out the lightening holes.
| Today’s Time (hours): | 1.0 |
| Fuselage Time (hours): | 161.0 |
| Total Time (hours): | 615.5 |
Machine countersunk the baggage floor splice plate and riveted in place.

dimpled the flap motor channel and installed the nut plates. Then riveted it in place. Riveted the flap motor brackets to it.
Riveted the baggage side walls in place.

Bam! Baggage area. Done.

| Today’s Time (hours): | 3.0 |
| Fuselage Time (hours): | 155.0 |
| Total Time (hours): | 609.5 |
Riveted the baggage area floor skins in place. Riveted the seat back hinges to the floor skins.

| Today’s Time (hours): | 3.0 |
| Fuselage Time (hours): | 152.0 |
| Total Time (hours): | 606.5 |
Fabricated the seat back hinges and match drilled to the floor skins.

Deburred, Scuffed, and primed all of the parts.

Dimpled the floor skins and riveted the nut plates in place.
Installed snap bushing and routed the rudder cables, static line, and ELT wire.

| Today’s Time (hours): | 5.0 |
| Fuselage Time (hours): | 149.0 |
| Total Time (hours): | 603.5 |