Progress continues on wiring

I’ve neglected to post over the past week. Been a busy week at work. I have made some good progress though.

I vinyl-wrapped the fuse block panel and screwed the fuse block into it. I made a bus bar from a strip of copper to tie together the upper and lower buses of the fuse block.

 

I drilled some system holes through the left seat ribs, installed snap bushings, and ran the pitot and AOA lines from the wing root to the panel.

 

Drilled a couple of system holes in the lower sub-panel. Routed the the wires for the battery backup. Terminated the grounds for the the IBBS and the IBBS master switch.

 

Made up the connectors for the GTX 45R transponder and the GTN 625 GPS. I also started on the GTR 200B COM radio but didn’t get a picture.

 

Today’s Time (hours): 6.0
Finish Kit (hours): 112.0
Total Time (hours): 842.0

 

Began wiring the panel

I’ve spent quite a bit of time researching and documenting a plan to make the wiring easy. I complied a list of wiring nodes in a spreadsheet that I can use as a checklist to work my way through the project. You can see my work here… Wiring Plan

Didn’t actually wire anything today but rather did a lot of the prep work. I fabricated a center panel that will hold the fuse block in the center pedestal. I purchased the power panel option from Van’s which included the sheet metal for the center console. I purchased the 32 position Busman fuse block from Waytek.

 

Prepped everything up and painted it to match the interior.

img_4480

 

Removed all of the avionics and the panels. I probably could have left the stuff mounted to the sub panel and left the panels in place. But when I had mounted everything with black oxide steel screws and subsequently learned that they would rust over time. So I purchased black oxide stainless replacements. This was the most opportune time to replace them all.

 

I installed a ground block being careful to remove all the paint and scuff up the sub-panel to ensure a good electrical connection. I re-mounted the backup battery, the GAD 27, GAD 29, and GEA 24 to the sub panel.

 

I drilled a couple of new wire holes through the bottom of the stand-offs and installed snap bushings. The original holes interfered with the GTX and the switches in the bottom of the middle panel.

img_4481

 

Today’s Time (hours): 8.0
Finish Kit (hours): 106.0