Wired the GSU 25 ADAHRS.
Wired the G5 backup flight instrument.
Pilot side complete. I still have a bit of tidying up and lacing to do. But everything is wired.
Terminated all of the ground lines to the ground block.
Wired the PFD2 GDU 460.
I still need to install the fuse panel and wire it up. I also need to wire the GMU 11 in the wing and reconfigure the connectors at the wing roots. Then the wiring will be complete.
Today’s Time (hours): | 7.0 |
Finish kit (hours): | 157.0 |
Total Time (hours): | 891.0 |