Pitch Trim Servo Installed

I got back from my work trip to Toronto this evening and my new Molex connectors and pins had arrived. So I was able to crimp on the last pin and push the pins into the connector. Then I installed it into the elevator and connected the pushrod to the trim tab horn with a clevis and cotter key.

IMG_1864

IMG_1866

IMG_1867

You can also see where I safety wired the trim tab hinge pin in place. As soon as I get the rivets I ordered from Aircraft Spruce, I’ll be able to complete the elevators.

 

Today’s Time (hours): 0.5
Empennage Time (hours): 128.5
Total Time (hours): 128.5

 

Four out of Five Ain’t Bad

My new molex crimper arrived from amazon along with the new automatic wire stripper. Yay! New tools.

These Molex MicroFit  pins are teeny tiny. I managed to crimp four out of the five pins on to the wires from the trim servo correctly. Unfortunately there was only one extra pin provided and I already burned through that one on my first attempt. So I ordered a bunch of  extra molex pins and housings.

IMG_1856

Today’s Time (hours): 0.5
Empennage Time (hours): 126.0
Total Time (hours): 126.0

 

Riveted Spars and Ribs in Left Elevator

I started off the day by taping the trailing edge to the bottom right elevator skin with the 3M VHB. tape.

IMG_1830

I also completed the trim servo assembly. I need to order a crimper to terminate the wires from the trim servo with the supplied micro molex connector. I also need to get a label maker to label all the terminations.

IMG_1831

Then my new squeezer set from Aircraft Spruce showed up. It’s nice having them relatively local. If I order by 4:00 they’ll ship same day and shipping via UPS ground gets it here next day from Peachtree City.

With the new squeezer sets I was able to complete the riveting of the hinge portion of the skin to the aft spar.

IMG_1833

I essentially completed all of the steps that I did to the right elevator yesterday to the left elevator today. So now both elevators are ready to have the aft ribs glued and the trailing edges riveted.

IMG_1834

 

Today’s Time (hours): 6.0
Empennage Time (hours): 118.5
Total Time (hours): 118.5