Finished the forward and aft center section bulkheads

Riveted the cover ribs to the forward center section bulkhead. Added the AN3 bolts, nuts, and washers and torqued them down.

 

Secured the bearing bracket braces to the bearing brackets with screws, washers, and nuts. The riveted them to the bulkhead and opposing ribs.

 

Reamed the .375 and .311 holes in the center section bulkheads.

img_3285

 

The parts I ordered from vans should be here Tuesday. Then I can finish out this section.

 

Today’s Time (hours): 2.0
Fuselage Time (hours): 13.0
Total Time (hours): 467.5