Constructed a support leg from scrap wood and bolted to the bulkheads. Then turned the fuselage assembly up on its side to rivet the bottom.
Put clecos in all holes to be riveted. The final drilled and blind riveted the bottom skins to the drag links. This is as far as I could get without a riveting partner.
Sealed the muffler ramp to the bottom skins with fuel tank sealant.
Dimpled and countersunk all of the parts except the skins.
Riveted the roll bar angles to the intercostal ribs.
Fabricated the seat adjustment guides and assembled the seat adjustment stuff to the cross brace.
Today’s Time (hours): | 5.0 |
Fuselage Time (hours): | 94.0 |
Total Time (hours): | 548.5 |