Riveted Aft Spars to Skins

Began riveting the bottom top left skin to the aft spar.

IMG_1810

Everything was going great until I got to the part with the trim tab hinge. My bucking bar won’t reach around the hinge eyelets.

Side note: after all of this, I realized that the shear clip was supposed to be on the outside of the closeout tabs in the picture below. So ended up drilling it out and re-attaching it properly. Funny thing is that last week I mentioned to Jared and Wes that I thought it would look better on the inside. Subconscious got the better of me i guess.

IMG_1812

I thought of using the squeezer on these rivets but I only have two flush sets. One is too long and the other is two short. I hit up Jared and he’s got a flush set that’s halfway between the two. He volunteered to swing by tomorrow morning and do some building with me. So I set the left elevator aside until tomorrow.

IMG_1813

I moved on to the right side and riveted the bottom skin to the aft spar. I taped all of the rivets in place to back rivet the ribs. I shot one row but it’s really load and it’s getting late so decided to call it quits for the night.

IMG_1814

Today’s Time (hours): 2.0
Empennage Time (hours): 108.0
Total Time (hours): 108.0

 

Riveted the Forward Spar Assemblies

Riveted the gusset to the left root rib and riveted the inboard and outboard halves of the tip ribs together. Spent a bit of time with a square and hand seamers tweaking to ensure everything is straight.

IMG_1803

Riveted the tip ribs to the spars. Riveted the hinge reinforcement plates and nut plates to the spars.

 

IMG_1805

Clecoed and riveted the counterweight skins to the tip ribs.

IMG_1807

Riveted the elevator horns to the spars.

IMG_1808

Bruins vs. Blackhawks in the winter classic on tv… taking a break to watch a little hockey.

Today’s Time (hours): 2.5
Empennage Time (hours): 106.0
Total Time (hours): 106.0

 

Assembled Trim Tab

Bought a 3/4″ MDF panel at Home Depot. Leveled it out on the bench and shimmed the dead spaces with sheets of paper to create a flat surface.

IMG_1794

Prepped the skins, spar, and trailing edge with isopropyl.  Mixed up a small batch of fuel tank sealant and put a thin layer on each side of the trim tab ribs and set them in place. I used the 3M VHB tape on both sides of the trailing edge. Used clecos to align it with the bottom skin and set it in place. Then I clecoed the top skin in place along the spar and trailing edge. I peeled the paper from the VHB tape between the top of the trailing edge and the top skin removing clecos as I went to avoid tearing the paper. I replace the clecos to clamp the whole sandwich together while the tape sets up.

IMG_1795

The sealant is ridiculously sticky and smells like ass.

IMG_1796

I riveted the top skin and hinge to the spar.

IMG_1797

All done!

IMG_1798

Weighted down the skin with a board and some 2×4’s to ensure contact between the skins and the ribs until the sealant sets up. The spec sheet says there is a 6 hour cure time for the B 1/2 sealant I used.

IMG_1799

 

Today’s Time (hours): 1.5
Empennage Time (hours): 101.5
Total Time (hours): 101.5

 

Primed, Dimpled, and Started Assembly

Busy day of building today! Started off with a Home Depot run to pick up some paint pots and gloves. Then I got set up and shot all of the elevator part and skins with primer.

IMG_1777

That was a lot of stuff to prime. Didn’t mix enough and had to make a second batch to finish the skins.

IMG_1778

Once the primer was dry, I brought everything in the house and dimpled the skins and all the ribs, spars, and other miscellaneous parts. Clecoed the forward half of the trim tab hinge to the aft spar and  machine countersunk the portion of the aft spar that attaches to the hinge. Did a similar job on the trim tab spar later.

IMG_1780

Modified my female #40 dimple die to enable dimpling of the nut plates needed for the trim tab servo doubler. I just ground off a bit of the edge on the bench grinder.

IMG_1781

Here’s the modified die in action squeezing a dimple into a nut plate.

IMG_1784

And here are the nut plates installed in the doubler.

IMG_1785

I machine countersunk the parts of the trim tab pushrod and double flush riveted it together. The plans called out AN426-3-3.5 rivets but those were too short. I used -4.5’s and they came out perfect.

IMG_1787

Clecoed together the trim tab with the spar and trailing rdge and final drilled the holes in the closeout tabs.

IMG_1788

I machine countersunk the the trailing edges for the trim tab and left elevator using the tapered-pilot countersink cutter. I’m still waiting for the right trailing edge from Van’s to replace the one a screwed up.

IMG_1790

I riveted the trim tab horns and spar to the bottom trim tab skin.

IMG_1791

Taped off the places on the skins and spar where I’ll bond the ribs and trailing edge in order to prep for the ProSeal and trailing edge tape. I removed the primer with isopropyl. I scuffed with 150 grit sandpaper. Then cleaned the scuffed areas with acetone. Then I removed the tape.

IMG_1792

Tomorrow will be my first experience with ProSeal. I’ll be using it to glue the trim tab ribs in place. Plans call for a “well and truly flat” work surface on which to weight down the trim tab while the ProSeal sets up. I don’t consider my workbenches to be “well and truly flat.” So I’ll be off to Home Depot again tomorrow to come up with something. Maybe a steel plate or a 3/4″ MDF panel?

Today’s Time (hours): 9.0
Empennage Time (hours): 100.0
Total Time (hours): 100.0

 

Horizontal Stabilizer Complete

Riveted the skin to the forward spar and all the ribs. Did all of these rivets with the gun and small tungsten bucking bar. It was a long day. Only had to drill out a couple of duds, though.

IMG_1743

Then clecoed the rear spar to the ribs and skins and riveted in place. The inboard and outboard ribs are riveted with AN470-4 rivets while all the others are blind-riveted with LP4’s. I used the squeezer to rivet the skins to the rear spar flanges.

Et Viola…

IMG_1744

IMG_1745

Merry Christmas!

Today’s Time (hours): 7.0
Empennage Time (hours): 76.0
Total Time (hours): 76.0

 

Primed and Assembled Horizontal Stabilizer

Scuffed and primed the skins, ribs, stringers and center web.

IMG_1728

IMG_1729

Riveted together the inboard ribs, web, and stringers.

IMG_1732

Clecoed and riveted the ribs to the front spar

IMG_1735

Clecoed and riveted four nose ribs to the skins. Special thanks to Jared Solomon for lending me his HS cradles. Also for the awesome flight flight yesterday in his RV-14. Makes me want to build faster.

IMG_1736

IMG_1737

Clecoed the forward spar and associated substructure to the skins. Ready for final riveting. Should have the HS buttoned up tomorrow!

IMG_1740

IMG_1741

A very satisfying day of progress!

Today’s Time (hours): 5.0
Empennage Time (hours): 69.0
Total Time (hours): 69.0

 

Forward Spar Assembly Complete

Riveted the doubler and spar caps to the forward spar.

IMG_1711

IMG_1712

IMG_1713

I received the torque wrench I ordered from Amazon and torqued the nuts securing the inboard hinge bracket to the rear spar.

IMG_1714

Both forward and rear spar assemblies completed. On to the ribs…

IMG_1715

Today’s Time (hours): 2.0
Empennage Time (hours): 58.0
Total Time (hours): 58.0

 

Rear spar assembly complete

Scuffed the forward spar and primed all of the forward and rear spar parts.

IMG_1702

Riveted the front spar doubler. Used the squeezer for most of these.

IMG_1704

Riveted all of the hinge brackets. Used the gun for these. My riveting skills have improved markedly. I haven’t had to drill any rivets since working on the rudder.

I bolted the inboard hinge bracket to the spar per the plans and realized I don’t have an in/lb torque wrench. So I ordered one from Amazon along with some tamperproof marker paint so I can keep track of which nuts have been torqued and easily inspect them later.

IMG_1705

Off to FLL for work for the next few days. So no further progress expected until later in the week.

Today’s Time (hours): 2.5
Empennage Time (hours): 56.0
Total Time (hours): 56.0

 

Horizontal Stabilizer Rear Spar

Started work on the horizontal stabilizer today. The first part involves preparing the rear spar.

Screen Shot 2019-05-27 at 9.59.23 AM

Deburred the rear spar and the rear spar doubler with the Scotch Brite wheel, files, a deburring tool and god old fashioned sandpaper. Got all the edges and lightening holes nice and smooth. Clecoed the rear spar doubler to the rear spar. Final drilled all the holes.

IMG_1687

Clecoed the 8  outboard hinge brackets to the spar and final drilled.

IMG_1688

Machine countersunk the two holes in the center of the spar.

IMG_1689

Fit, clecoed, drilled, disassembled, deburred, reassembled, and riveted the inboard hinge bracket assembly with the flange bearing in the middle.

IMG_1691

Deburred and scuffed everything. Ready for primer. I’m only going to prime the inside of the spar. the outside will be painted when I paint the airplane. I neglected to account for this when I built the VS and rudder. I’m assuming the primer can be stripped from the outside of those spars in preparation for painting.

IMG_1690

 

Today’s Time (hours): 2.5
Empennage Time (hours): 48.5
Total Time (hours): 48.5

 

Vertical Stabilizer Complete!

Scuffed and prepped the new parts. Then sprayed them with primer.

IMG_1677

Riveted the doubler and ribs to the forward spar.

IMG_1678

Clecoed the skin to the forward spar and ribs and started riveting.

IMG_1679

Finished riveting the skin to the forward spar and ribs.

IMG_1681

Clecoed and riveted the rear spar to the skin and ribs.

IMG_1682

VS Complete! Very pleased with how well it turned out. Once I replaced the parts I messed up, everything went smoothly. I’m much happier with my workmanship than the first attempt. A little experience makes a world of difference.

IMG_1683

IMG_1684

Rearranged the work benches and started picking parts for the horizontal stabilizer.

IMG_1685

 

Today’s Time (hours): 3.0
Empennage Time (hours): 46.0
Total Time (hours): 46.0