Remy helped me finish riveting the fuselage together. I can’t imagine doing this without a rotisserie.

| Today’s Time (hours): | 2.0 |
| Fuselage Time (hours): | 144.0 |
| Total Time (hours): | 598.5 |
Remy helped me finish riveting the fuselage together. I can’t imagine doing this without a rotisserie.

| Today’s Time (hours): | 2.0 |
| Fuselage Time (hours): | 144.0 |
| Total Time (hours): | 598.5 |
Dimpled the bulkheads and riveted the nut plates to them.

Joined up the front and back and clecoed together. Starting to look very airplane-like.

I neglected to chamfer the top aft edges of the seatbelt lugs when I did the fabrication. So did that and Machine countersunk them. Then shot them with some rattle can primer and stuck them in the vise to dry.

| Today’s Time (hours): | 2.0 |
| Fuselage Time (hours): | 131.0 |
| Total Time (hours): | 585.5 |

This section only has a few parts and I was setting up to prime all the parts for section 29 so figured i’d get these while I was at it. Picked and inspected the parts. Cut apart the ones that needed to be separated on the band saw. Deburred all the edges. Scuffed and primed everything.
| Today’s Time (hours): | 1.0 |
| Fuselage Time (hours): | 84.0 |
| Total Time (hours): | 538.5 |