Riveted the top skins to the bulkheads Riveted the seatbelt lugs and the bulkheads together. The riveted the top skins to each other, the bulkheads and the longerons. Today’s Time (hours): 2.0 Fuselage Time (hours): 133.0 Total Time (hours): 587.5 Share this:TwitterFacebookLike this:Like Loading... Related