This section only has a few parts and I was setting up to prime all the parts for section 29 so figured i’d get these while I was at it. Picked and inspected the parts. Cut apart the ones that needed to be separated on the band saw. Deburred all the edges. Scuffed and primed everything.
Today’s Time (hours): | 1.0 |
Fuselage Time (hours): | 84.0 |
Total Time (hours): | 538.5 |