Primed all the mid fuse side structure parts and began assembly

Primed all the mid fuse side structure parts.

 

Clecoed the mid fuselage to the forward fuselage section. Removed the bulkhead bars. Installed the angle fitting for the brake line into the landing gear brace with some thread sealant.  Bolted the lower drag fittings and gear braces to the fuselage structure. Bolted the upper drag fittings in place. Clecoed the center section side plates in place. Clamped the side plates to the upper drag fitting in preparation for drilling.

 

Mating up the forward and mid fuselage sections was pretty satisfying. Starting to look like something.

 

Today’s Time (hours): 3.0
Fuselage Time (hours): 87.0
Total Time (hours): 541.5

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s