I ran out of heat shrink labels. So wiring came to a halt. I decided to install the cabin heat control cables yesterday. I figured it would be easier while the fuselage is still on its side.
I ran the pitot, AOA, and static lines through holes I drilled in the sub panel.
This evening, I reinstalled the radio racks and instrument panel in preparation for wiring the GDU’s, G5, and panel switches.
Today’s Time (hours): | 4.0 |
Firewall Forward (hours): | 4.0 |
Total Time (hours): | 872.0 |