Completed Aileron and Elevator Systems (Section 36)

Checked the fore and aft travel of the control system with a digital level using the top of the cover rib as a reference. Filed the control column bracket stops until I achieved the specified range of travel in each direction and the control column hit the stops on both side simultaneously.

 

Installed the control sticks and measured the distance between them. Thy were spot on so I guess I measured the control stick tie rod correctly. No adjustment necessary.

 

I double checked that I torqued all the hardware properly and marked everything with torque seal. I decided to wait on installing that aft elevator push tube until I reinstall the tail feathers at the airport.

 

Today’s Time (hours): 1.0
Fuselage Time (hours): 215.0
Total Time (hours): 670.5

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s