Primed the control system parts and began assembly

Primed all the parts.

img_3948

 

Bolted the elevator idle arm in place.

img_3949

 

Assemble the stick link pushrod.

img_3950

 

Riveted the elevator pushrod ends into the rods and added the rod end bearings.

 

Bolted the forward push tube to the control column.

img_3954

 

Put together the elevator bell crank assembly. riveted the bell crank halves together with the flange bearing in the middle. Machine countersunk the the nut plate holes in the bell crank bracket and riveted in the nut plates. Bolted the bell crank angles to the bell crank and then to the bell crank bracket. Machine countersunk and riveted together the yaw servo bracket. The match drilled it to the the fuselage and installed the bell crank assembly together with the mid elevator push tube, pitch servo bracket, and yaw servo bracket.

 

Connected the forward and mid push tubes to the idler arm.

img_3961

 

Final rilled the control stick bases to the control sticks. The installed the bases into the control column. Bolted the stick link to the right hand stick base. I’ll bolt up the other side after I’ve checked the alignment of the sticks.

img_3962

 

Today’s Time (hours): 6.0
Fuselage Time (hours): 214.0
Total Time (hours): 669.5

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s