Primed all the remaining wing parts

Drilled holes for and installed angle of attack sensor tubing. Also ran wires for pitot heat.

 

Drilled the rivet holes for all the aileron push tube ends and prepared all the parts for priming.

 

Primed all the remaining wing parts.

 

Installed the aileron and flap gap fairings.

 

Assembled the ADAHRS mounting bracket.

img_2945

 

Today’s Time (hours): 7.0
Wing Time (hours): 249.0
Total Time (hours): 401.0

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s