Sealed and riveted the J channel stiffener to the tank skin.
Installed the tank attach bracket assembly and added a fillet of sealant to the seam with the forward rib. I used an inspection mirror to ensure I got good coverage.
Made up the fuel vent line and installed into the tank.
Sealed and riveted the aft inboard tank rib in place. I installed the bulkhead fitting for the vent line and connected the vent line to it.
I didn’t have enough sealant left to fillet the aft rib. So I’ll do that in the next session.
Today’s Time (hours): | 3.0 |
Wing Time (hours): | 205.0 |
Total Time (hours): | 357.0 |