Work resumes on the tanks

I received the J-Channel that that I ordered from Van’s. I cut it to length with a cut-off wheel in the Dremel. Then cleaned up the edges on the Scotchbrite wheel. I measured and marked the centerline. Drilled the starter hole. Clecoed it in place and match drilled the rest of the holes, clecoing as I went.

 

I clecoed the baffle in place and machine countersunk the corresponding rivet holes in the tank skin.

 

I disassembled everything final drilled the #19 holes in the skin and then deburred them as well as the holes in the j-channel. I dimpled the J-channel with the pneumatic squeezer.

In other news… My propeller was delivered! It’ll be a while before I need it but ordered it at the same time as the engine to get a discount. The engine has a much longer lead time. Expecting it to show up mid October.

 

 

Today’s Time (hours): 2.0
Wing Time (hours): 142.0
Total Time (hours): 353.0

 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s