Cut and deburred the edges of the elevator ribs and clecoed them together. Also cut and deburred the shear clips.
Straightened and fluted the tip ribs. Deburred the edges of the ribs and the counterweight skins. Clecoed everything together. Ready for drilling.
Copied the plans page with the templates for the foam trailing edge ribs and the trim tab ribs. Checked to ensure that the copy was 1:1 withe respect to the original.
Today’s Time (hours): | 3.0 |
Empennage Time (hours): | 80.0 |
Total Time (hours): | 80.0 |