More Work on Elevators

Jared Solomon and Wes Greer stopped by today and helped move the elevators along. I really appreciate having experienced builders helping me out.  Things went really fast and their advice is incredibly valuable. Had lot’s of fun building together, too. Thanks guys!

Today we final drilled the tip ribs to one another and to the counterweight skins. We cut the foam trailing edge and trim tab ribs. We trimmed and deburred the trim tab skins. We trimmed the right elevator aft spar. We bent the closeout tabs on the left elevator skin. We fit and drilled the trim tab hinge. We clecoed everything together and fit/trimmed the elevator trailing edges.

IMG_1759

Jared and Wes went home and I continued building. Not even ten minutes unsupervised and I screwed up! I misunderstood the interface between the trailing edge extrusion and the elevator wing tip. I removed way too much material from the trailing edge. I didn’t realize that the wing tip would be trimmed and butt up against the trailing edge. Had I read forward to the “Empennage Fairings” section, I would have understood how this went together. Oh well… Ordered a new trailing edge from Van’s.

IMG_1765

 

Today’s Time (hours): 5.0
Empennage Time (hours): 85.0
Total Time (hours): 85.0

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s