Picked and Inspected Parts for Elevators

Read through the plans for the elevators and picked all the parts. I also cleaned up the workshop.

I ordered some fuel tank sealant from SkyGeek. Neither Van’s nor Spruce had pint cans. I only need enough to cement the elevator and trim tab ribs in place. And the stuff has a relatively short shelf life.

Screen Shot 2019-05-27 at 10.03.16 AM

IMG_1752

 

Today’s Time (hours): 1.0
Empennage Time (hours): 77.0
Total Time (hours): 77.0

 

Leave a comment