Completed assembling left tank

Same drill as the right tank yesterday…

 

Both tanks are now fully assembled. I’ll give them a few days and then pressure test them to find and seal any leaks. Then I can attach them to the wings and move on to the bottom wing skins and aileron actuation.

 

Today’s Time (hours): 3.0
Wing Time (hours): 229.0
Total Time (hours): 381.0

 

Finished assembling right tank.

Added a bead of tank sealant for the baffle. Clecoed the baffle in place. Riveted the baffle to the ribs and then riveted the z-brackets in place. Then riveted the baffle to the skin.

 

Installed the fuel drain, the fuel sender, AN fittings, and the fuel cap.

 

Machine countersunk the holes in the tank attach bracket for #8 screws.

img_2881

 

The right tank is now complete and once the sealant has cured, I can pressure test it. Hoping to get the left tank to the same state tomorrow.

 

Today’s Time (hours): 3.0
Wing Time (hours): 226.0
Total Time (hours): 378.0