Added a bead of tank sealant for the baffle. Clecoed the baffle in place. Riveted the baffle to the ribs and then riveted the z-brackets in place. Then riveted the baffle to the skin.
Installed the fuel drain, the fuel sender, AN fittings, and the fuel cap.
Machine countersunk the holes in the tank attach bracket for #8 screws.
The right tank is now complete and once the sealant has cured, I can pressure test it. Hoping to get the left tank to the same state tomorrow.
Today’s Time (hours): | 3.0 |
Wing Time (hours): | 226.0 |
Total Time (hours): | 378.0 |