Eeked out a few hours of building this week.
Installed the fuel overflow tube.
Installed the dipstick tube and lock wired it in place.
I ordered a tach cover from Vans and this is what showed up. It has no means to lock wire it. I’m going to replace it with one from Spruce.
Installed the oil temperature sensor.
Installed the alternator.
Installed the cylinder head temperature sensors.
Today’s Time (hours): | 4.0 |
Finish kit (hours): | 197.0 |
Total Time (hours): | 931.0 |