Riveted the rail bases to the forward canopy frames. Clecoed the skins and splice plates to the frame along with the rails. Clecoed the forward and aft fixtures to the bottom of the forward canopy frame. Carefully leveled everything and checked for twist in the structure. Rolled a curve into each end of the canopy frame closeout and clecoed it in place. Match/final drilled the closeout.
Machine countersunk the aft ends of the canopy rail flanges. Fluted the canopy rail angles and match/final drilled. These are thick aluminum. Glad I ate my Wheaties this morning. Machine countersunk the holes in the bottom of the angles. Then riveted the flanges to the angles. The plans called for dome head rivets with the shop heads set into the countersinks on the bottoms of the angles achieving a near-flush shop head.
Bent aft half of the rails to match the curve of the fuselage. Match/final drilled the rails to the angles. You’ll note the tape on the clecos. The plans have you cleco everything together through the matched holes. Then add clecos as you match drill each additional holes. Then go back and remove the original clecos and final drill those holes. So the tape was a reminder as to which were the original clecos. Machine countersunk the holes in the rails called out in the plans and riveted the rails to the angles.
Clecoed and final drilled the skins to the rails. Match drilled the canopy handle to the assembly as well.
Clecoed the the rail assemblies to the forward canopy frame assembly and final drilled.
Disassembled everything.
My Back-ordered nose gear leg showed up today. Still waiting on the mains. Fedex delivered package 2 of 2 but not 1 of 2. Hopefully it will show up tomorrow. Fedex tracking says it’s in Forest Park. Not sure why given that it was in Kennesaw with the other package last night.
Today’s Time (hours): | 6.5 |
Finish Kit (hours): | 33.0 |