Cut all the parts that needed parting.
Fabricated the canopy handles from aluminum angle.
Deburred and scuffed all the parts.
Primed everything.
Started assembling the canopy frame. Dimpled and rivered the hinge intercostals. Dimpled the skin. Fluted and fit the substructure. Started riveting the substructure together.
Today’s Time (hours): | 6.0 |
Finish Kit (hours): | 26.5 |
Total Time (hours): | 756.5 |