Drilled and tapped the aluminum tubes to accept the 1/4 threads of the rod end bearings. Assembled the AP pushrods. Fabricated the spacer for the roll servo.
Installed the roll servo into the right wing.
Today’s Time (hours): | 2.0 |
Wing Time (hours): | 266.0 |
Total Time (hours): | 418.0 |