Jared came by again today to help out. Thanks, man. You’re the best!
We got the fuel drains, fuel filer and stiffeners re-installed.
Installed the ribs in the right tank.
Made up installed the vent line for the right tank. Added installed the right tank attach bracket and aft inboard rib and filleted everything with sealer. Both tanks are now ready to be closed out with the rear baffle.
I cannot over state what a sticky, smelly, messy process this is. My shop looks like a sealant bomb went off. Every tool I own has some sealant on it now.
Today’s Time (hours): | 10.0 |
Wing Time (hours): | 222.0 |
Total Time (hours): | 374.0 |