Clecoed then riveted each flap substructure together.
Clecoed the leading edge skins in place and set the flap assemblies into the cradles. Clecoed the top skins in place. Riveted the right top skin.
Today’s Time (hours): | 2.0 |
Wing Time (hours): | 160.0 |
Total Time (hours): | 371.0 |