Match drilled the J channel to the spar.

Machine countersunk the nutplate attach holes.

Riveted in the nutplates

Countersunk the screw holes.

Machine countersunk all the skin attach holes.

Riveted in the nutplates at the tip end of the spar.

Riveted the doubler to the spar and installed the tank attach nutplates.

Final drilled, deburred, scuffed and primed the aileron bell crank brackets

Installed and torqued the aileron bell crank brackets.

Right spar done!

| Today’s Time (hours): | 4.5 |
| Wing Time (hours): | 21.5 |
| Total Time (hours): | 232.5 |
