Filled the crag I cut in the right HS tip with micro.
Then filled the aft space of each with micro. Once hardened, I’ll be able to sand the curved profile into them to match the leading edges of the elevator tips.
Today’s Time (hours): | 0.5 |
Empennage Time (hours): | 203.5 |
Total Time (hours): | 203.5 |