Decided to just get this out of the way tonight…
I went through three changes of gloves and still managed to get it on my hands.
Prepped the scuffed surfaces with isopropyl.
Sealed the trialing edge ribs in place. Peeled the tape and stuck the top skins to the trailing edges. Weighted down the aft section to ensure good bond of the skins to the ribs. The sealer cures in six hours according to the data sheet. So should be riveting the trailing edge and finishing up tomorrow.
Bent the trim tab hinge pin per the plans.
Today’s Time (hours): | 1.0 |
Empennage Time (hours): | 119.5 |
Total Time (hours): | 119.5 |