Completed Cowling

Drilled the screw holes on the bottom of the cowling

img_4953

 

Attached the inlet ramps with epoxy and flox. Filled, sanded and sealed the areas where the baffle seals will seal against the top cowl.

 

Installed the heat shield foil in the lower cowl and sealed the edges with epoxy.

img_4958

 

Today’s Time (hours): 10.0
Finish kit (hours): 277.0
Total Time (hours): 1011.0