Began work on mid fuselage lower structure

Screen Shot 2019-09-02 at 3.09.39 PM

 

Picked and inspected all the parts. There are a lot of them.

 

Cut all the parts that needed to parted using hacksaw, bandsaw, and Dremel. Pro tip: peel the parts BEFORE you cut them. Otherwise there are a lot more of them to peel. Duh!

img_3288

 

Peeled all the parts.

img_3289

 

Ready for edge deburring.

 

Today’s Time (hours): 3.0
Fuselage Time (hours): 16.0
Total Time (hours): 470.5