Match drilled vertical stabilizer skin to substructure

We had help from my brother-in-law, John O’Brien today. Lot’s of fun building with family! We cleco’d the skin to the substructure, match drilled all the #40 holes, disassembled everything, and peeled the blue plastic from the rivet lines on the skins with a soldering iron that I blunted on the bench grinder.

img_1506

img_1507

img_1508

Today’s Time (hours): 2.0
Empennage Time (hours): 4.5
Total Time (hours): 4.5