I removed the canopy side skins. Final drilled them to #27. Clecoed them back on and final drilled all the hole sin the canopy and substructure #27.
Today’s Time (hours): | 1.0 |
Finish Kit (hours): | 45.0 |
Total Time (hours): | 775.0 |
I removed the canopy side skins. Final drilled them to #27. Clecoed them back on and final drilled all the hole sin the canopy and substructure #27.
Today’s Time (hours): | 1.0 |
Finish Kit (hours): | 45.0 |
Total Time (hours): | 775.0 |