Picked, Inspected, and peeled all the parts. Cut the parts on the band saw that needed to be separated. Deburred, and scuffed everything.
Used the template from the plans to drill the ends of the elevator push tubes. Match drilled the rod end fittings to the tubes.
Everything ready to prime.
Today’s Time (hours): | 2.0 |
Fuselage Time (hours): | 204.0 |
Total Time (hours): | 658.5 |