Began work on the baggage area (Section 32)

Picked and inspected all the parts. Then I peeled everything.

 

Fabricated the flap bushings and installed them into the fuselage.

 

Today’s Time (hours): 2.0
Fuselage Time (hours): 141.0
Total Time (hours): 595.5

Leave a comment