Finished the Forward Mid Fuselage Side Structure (Section 29)

Match drilled the side gussets to the upper longerons and Machine countersunk the holes in the gusset.

 

Riveted the cross brace to the fuselage.

img_3717

 

Riveted the gussets and intercostals into place. Bolted on and torqued down the roll bar braces.

 

Trimmed and scuffed the NACA ducts for the fresh air vents. The instructions recommended waiting until section 35 to assemble and install.

img_3723

 

This was a really long section but the result is really rewarding…

 

Next up I attach the aft fuselage! Exciting next step.

 

Today’s Time (hours): 2.0
Fuselage Time (hours): 129.0
Total Time (hours): 583.5

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s