Finished the Forward Mid Fuselage Side Structure (Section 29)

Match drilled the side gussets to the upper longerons and Machine countersunk the holes in the gusset.

 

Riveted the cross brace to the fuselage.

img_3717

 

Riveted the gussets and intercostals into place. Bolted on and torqued down the roll bar braces.

 

Trimmed and scuffed the NACA ducts for the fresh air vents. The instructions recommended waiting until section 35 to assemble and install.

img_3723

 

This was a really long section but the result is really rewarding…

 

Next up I attach the aft fuselage! Exciting next step.

 

Today’s Time (hours): 2.0
Fuselage Time (hours): 129.0
Total Time (hours): 583.5

Leave a comment